Project Description

Client

Intermediate School Killorglin

Project Value

€1.0m

Project Duration

10 months

Design Team

Kane Williams Architects
Kane Crowe Kavanagh QS
Giles O’Connor Consulting Engineers

Project Description

The works consisted of a new three storey science building containing four science laboratories, three preparation rooms, two student WC areas, one staff WC and one Assisted Shower Room/WC with a total floor area of 729m2. This is a standalone building and constructed to the rear of the school behind the library building.  A portion of the ground floor is partially below ground and it will be serviced by a lift.  Four existing rooms in the main school building will be refurbished as part of these works.

The site has an access road with shared pedestrian and vehicular access running adjacent to it.  A portion of this road was fully closed and inaccessible during the works.  There was one main vehicular entrance to the site and a ring road around the school.

OUR CLIENTS