Knockrabo D14, Dublin

Client

Knockrabo Investment DAC

Project Duration

108 weeks

Design Team

Architect: Reddy Architecture + Urbanism
PQS: KSN
Engineer: Waterman Moylan
M&E: Wateran Moylan

Landscape Architect: DFLA

 

Project Description

Knockrabo Development Phase 2 consists of the construction of 227 Apartments over 4no Blocks including semi-basement podium.

The development includes ancillary site development works to facilitate site services, piped infrastructure, 2 no. sub-stations, public lighting, plant, bin stores, bike stores, boundary treatments and hard and soft landscaping.

• Construction of 227 no. residential units in 4 no. separate apartment blocks ranging in height from 2 – 8 storeys including semi-basement podium, comprising of 76 no. 1 bed units, 145 no. 2 bed units and 6 no. 3 bed units.

• Balconies/Wintergardens are provided on all elevations at all levels for the 4 no. apartment blocks, with (Private) Terraces provided at top floor levels and a communal Roof Terrace of c. 198 sq m to be provided on Block F.

• Provision of 389 no. private residential bicycle parking spaces and 130 no. visitor bicycle parking spaces.

• A total of 178 no. residential car parking spaces, which comprises 125 no. residential podium parking spaces and 35 no. residential on-street parking spaces, as well as 16 no. visitor/drop off parking and 2 no. car sharing on-street parking spaces.

• Provision of 537.2 sqm internal tenant amenity space.

• The main vehicular entrance to the scheme will be from mount Anville Road while access to the site compound will be via Knockrabo Way off Mount Anville Road.

• All other ancillary site development works to facilitate site services, piped infrastructure, 2 no. sub-stations, public lighting, plant, bin stores, bike stores, boundary treatments and hard and soft landscaping.

• The application does not impact on the future access to the Reservation for the Dublin Eastern Bypass.

• Siteworks to include new services and hard and soft landscaping.

Back To Projects

Similar Projects

Cherrywood Town Centre, Dublin (TC1)

Cherrywood Town Centre, Dublin (TC4)

1BQ, Limerick

Lisieux Park Dublin

Lisieux Park, Dublin

Marina Depot Construction Site, Cork

Marina Depot, Cork

greenpark apartments Limerick

Greenpark Apartments, Limerick

Knockrabo Dublin Residential

Knockrabo D14, Dublin

Deanrock Housing Estate

Deanrock Housing Development, Cork

Glounthaune Housing Development, Co. Cork

Ardhu Ryan, Limerick

Mulgrave Street Housing Development

Mulgrave Street Housing Development, Limerick

The Oaks Housing Estate

The Oaks Housing Estate, Limerick

Cliona Park Housing

Cliona Park Housing, Limerick

Scroll to Top